Timeline



12/07/22:

18:29 tele-i edited by vpsingh
(diff)
18:22 tele-i edited by vpsingh
(diff)
18:08 SR_Telework2022-23-873.pdf attached to UpLoads by vpsingh
18:08 NER_Teleworks2022-23-361a.pdf attached to UpLoads by vpsingh
18:08 MR_Telework2022-23-26.pdf attached to UpLoads by vpsingh
18:07 MoM_CCE_Works-review18-21.10.2022.pdf attached to UpLoads by vpsingh
18:07 ECR_Teleworks2022-23-685a.pdf attached to UpLoads by vpsingh
18:07 CR_Teleworks2022-23-704b.pdf attached to UpLoads by vpsingh
18:07 CR_Teleworks2022-23-704a.pdf attached to UpLoads by vpsingh
17:21 WikiStart edited by vpsingh
(diff)

12/01/22:

16:13 tele-i edited by vpsingh
(diff)
16:12 RBInternal_Circular22112022hin.pdf attached to UpLoads by vpsingh
Rly Board Internal Circular 22112022 hin
16:06 tele-i edited by vpsingh
(diff)

11/30/22:

11:23 dot_letters edited by vpsingh
(diff)
11:10 DO_Min_of_Com16112022.pdf attached to UpLoads by vpsingh
DO DDG (Mobile Technology) Ministry of Communication 16112022
11:09 Compact_LTE_Mobile_System.pdf attached to UpLoads by vpsingh
Compact LTE Mobile System

11/25/22:

17:21 tele-i edited by vpsingh
(diff)
17:16 OM-to-DoT_04082022.pdf attached to UpLoads by vpsingh
Regarding surrendering of 1.6 MHz spectrum in 900 MHz band.
15:28 tele-i edited by vpsingh
(diff)
15:23 tele-i edited by vpsingh
(diff)
15:22 tele-i edited by vpsingh
(diff)
15:19 DFCCIL13012022.pdf attached to UpLoads by vpsingh
Regarding surrendering of 1.6 MHz spectrum in 900 MHz band. DFCCIL
13:43 tele-i edited by vpsingh
(diff)
13:42 RBInternal_Circular22112022.pdf attached to UpLoads by vpsingh
Rly Board Internal Circular 22112022
13:31 ZonalRailwaysDirUpdate22112022.pdf attached to UpLoads by vpsingh
Zonal Railway Directory Updation 22112022
13:31 RBInternal_Circular22112022.docx attached to UpLoads by vpsingh
Rly Board Internal Circular 22112022
11:55 tele-i edited by vpsingh
(diff)
11:43 VSAT24112022.pdf attached to UpLoads by vpsingh
Regulatory payment for the operation of captive V-SAT on Indian Railways
10:34 tele-i edited by vpsingh
(diff)
10:31 MoM_CCEs_meeting28.10.2022.pdf attached to UpLoads by vpsingh
Minutes of the Meeting (VC) with CCEs All Indian Railways held on 28 …

11/23/22:

16:23 tele-i edited by vpsingh
(diff)
16:19 PCSTE_Committee_Report.pdf attached to UpLoads by vpsingh
PCSTE Committee Report
14:53 tele-i edited by vpsingh
(diff)
14:52 tele-i edited by vpsingh
(diff)
14:33 Inst_IBS_Rly_Premises03122018.pdf attached to UpLoads by vpsingh
Installation of In-house Building Solution (IBS) at Railway Premises
14:31 COW_alongwith_Polemount_Tower.pdf attached to UpLoads by vpsingh
Provision of CoW along with Pole Mount/Towers on Railway Land & Building

11/21/22:

18:04 tele-i edited by vpsingh
(diff)
18:00 3326798.pdf attached to UpLoads by vpsingh
Problem being faced by Railways in implementing IP-MPLS network

11/17/22:

16:34 policy_other_dte edited by vpsingh
(diff)
16:33 Clarification_15112022.pdf attached to UpLoads by vpsingh
Revision of Yardsticks of Telecom Department 15112022
16:26 RBE-128_2022-13102022.pdf attached to UpLoads by vpsingh
Revision of Yardsticks of Telecom Department.
15:40 tele-i edited by vpsingh
(diff)
15:32 Tele_Letter-15112022.pdf attached to UpLoads by vpsingh
Proper announcement regarding the changed name of Railway Stations

11/10/22:

12:30 WikiStart edited by vpsingh
(diff)
Note: See TracTimeline for information about the timeline view.