Changes between Version 494 and Version 495 of tele-i


Ignore:
Timestamp:
04/20/23 11:40:33 (14 months ago)
Author:
vpsingh
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • tele-i

    v494 v495  
    44
    55 ||'''SN'''||'''File No.'''||'''Subject'''||'''Date'''||'''Salient Features'''||
    6  ||21||2023/CE-I/EDCE(G)/Misc||[raw-attachment:wiki:UpLoads:Inst_incorporated_JPO_Cir18042023.pdf Instructions for incorporating the JPO, Circular etc. provision in the Tender Document for all works requiring digging work close to Railway signaling, telecom, electrical etc. cables.]||18.04.2023||Digging Work||
     6 ||23||2023/TeleDev/Targets||[raw-attachment:wiki:UpLoads:ZRsFinancialTargets2023-24.pdf Front loading of Capital Expenditure in the year 2023-24] ||18.04.2023||Financial Targets||
     7 ||22||2023/CE-I/EDCE(G)/Misc||[raw-attachment:wiki:UpLoads:Inst_incorporated_JPO_Cir18042023.pdf Instructions for incorporating the JPO, Circular etc. provision in the Tender Document for all works requiring digging work close to Railway signaling, telecom, electrical etc. cables.]||18.04.2023||Digging Work||
     8 ||21||2023/TeleDev/Unified Communicatiion||[raw-attachment:wiki:UpLoads:ZRsNetworkingFOISDR.pdf Networking arrangement for FOIS DR] ||17.04.2023||FOIS Network||
    79 ||20||2022/Tele/14(1)/2||[raw-attachment:wiki:UpLoads:BSNL_MTNL_Net12042023.pdf Mandatory Utilization of network of BSNL, MTNL & other similarly placed PSU like !RailTel and Powertel.] ||12.04.2023||MTNL, BSNL Network||
    810 ||19||2020/Tele/15(18)/4(3317053)||[raw-attachment:wiki:UpLoads:PMI-MII_PolicyGuidelines05042023.pdf Adherence to PMI-MII Policy Guidelines – Clarification from DoT] ||05.04.2023||DPIIT PMI-MII ||