Changes between Version 496 and Version 497 of tele-i


Ignore:
Timestamp:
04/27/23 12:34:51 (14 months ago)
Author:
vpsingh
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • tele-i

    v496 v497  
    44
    55 ||'''SN'''||'''File No.'''||'''Subject'''||'''Date'''||'''Salient Features'''||
    6  ||24||2023/TeleDev/Targets||[raw-attachment:wiki:UpLoads:TargetsTelecomWorks-FY2023-24.pdf Targets for Telecom Work F.Y.2023-24] ||19.04.2023||Telecom Targets||
    7  ||23||2023/TeleDev/Targets||[raw-attachment:wiki:UpLoads:ZRsFinancialTargets2023-24.pdf Front loading of Capital Expenditure in the year 2023-24] ||18.04.2023||Financial Targets||
    8  ||22||2023/CE-I/EDCE(G)/Misc||[raw-attachment:wiki:UpLoads:Inst_incorporated_JPO_Cir18042023.pdf Instructions for incorporating the JPO, Circular etc. provision in the Tender Document for all works requiring digging work close to Railway signaling, telecom, electrical etc. cables.]||18.04.2023||Digging Work||
    9  ||21||2023/TeleDev/Unified Communicatiion||[raw-attachment:wiki:UpLoads:ZRsNetworkingFOISDR.pdf Networking arrangement for FOIS DR] ||17.04.2023||FOIS Network||
    10  ||20||2022/Tele/14(1)/2||[raw-attachment:wiki:UpLoads:BSNL_MTNL_Net12042023.pdf Mandatory Utilization of network of BSNL, MTNL & other similarly placed PSU like !RailTel and Powertel.] ||12.04.2023||MTNL, BSNL Network||
    11  ||19||2020/Tele/15(18)/4(3317053)||[raw-attachment:wiki:UpLoads:PMI-MII_PolicyGuidelines05042023.pdf Adherence to PMI-MII Policy Guidelines – Clarification from DoT] ||05.04.2023||DPIIT PMI-MII ||
     6 ||26||2023/TeleDev/CCTVprojectsPt-1||[raw-attachment:wiki:UpLoads:VSS_addWorks_RCIL26.04.23.pdf Additional Cameras at Stations where VSS work is being executed by RCIL] ||26.04.2023||CCTV Cameras||
     7 ||25||2023/TeleDev/Targets||[raw-attachment:wiki:UpLoads:TargetsTelecomWorks-FY2023-24.pdf Targets for Telecom Work F.Y.2023-24] ||19.04.2023||Telecom Targets||
     8 ||24||2023/TeleDev/Targets||[raw-attachment:wiki:UpLoads:ZRsFinancialTargets2023-24.pdf Front loading of Capital Expenditure in the year 2023-24] ||18.04.2023||Financial Targets||
     9 ||23||2023/CE-I/EDCE(G)/Misc||[raw-attachment:wiki:UpLoads:Inst_incorporated_JPO_Cir18042023.pdf Instructions for incorporating the JPO, Circular etc. provision in the Tender Document for all works requiring digging work close to Railway signaling, telecom, electrical etc. cables.]||18.04.2023||Digging Work||
     10 ||22||2023/TeleDev/Unified Communicatiion||[raw-attachment:wiki:UpLoads:ZRsNetworkingFOISDR.pdf Networking arrangement for FOIS DR] ||17.04.2023||FOIS Network||
     11 ||21||2022/Tele/14(1)/2||[raw-attachment:wiki:UpLoads:BSNL_MTNL_Net12042023.pdf Mandatory Utilization of network of BSNL, MTNL & other similarly placed PSU like !RailTel and Powertel.] ||12.04.2023||MTNL, BSNL Network||
     12 ||20||2020/Tele/15(18)/4(3317053)||[raw-attachment:wiki:UpLoads:PMI-MII_PolicyGuidelines05042023.pdf Adherence to PMI-MII Policy Guidelines – Clarification from DoT] ||05.04.2023||DPIIT PMI-MII ||
     13 ||19||2022/GS/IR Cable laying policy||[raw-attachment:wiki:UpLoads:CableDuctPolicy.pdf Guidelines for S&T Cable laying in Ducts] ||29.03.2023||Cable laying||
    1214 ||18||2023/Tele/5(1)/1(3322591)||[raw-attachment:wiki:UpLoads:20230328PositionofTelecomAssetsinPCDO.pdf Position of Telecom Assets in PCDO] ||28.03.2023||Telecom Assets in PCDO ||
    1315 ||17||2020/Tele/Misc/1/1(3416153)||[raw-attachment:wiki:UpLoads:Tele_Dir_Update_24032023.pdf Updation of Telephone Directory] ||24.03.2023||Telephone Directory ||