Changes between Version 499 and Version 500 of tele-i


Ignore:
Timestamp:
05/09/23 10:01:12 (14 months ago)
Author:
vpsingh
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • tele-i

    v499 v500  
    44
    55 ||'''SN'''||'''File No.'''||'''Subject'''||'''Date'''||'''Salient Features'''||
    6  ||26||2023/TeleDev/CCTVprojectsPt-1||[raw-attachment:wiki:UpLoads:VSS_addWorks_RCIL26.04.23.pdf Additional Cameras at Stations where VSS work is being executed by RCIL] ||26.04.2023||CCTV Cameras||
    7  ||25||2023/TeleDev/Targets||[raw-attachment:wiki:UpLoads:TargetsTelecomWorks-FY2023-24.pdf Targets for Telecom Work F.Y.2023-24] ||19.04.2023||Telecom Targets||
    8  ||24||2023/TeleDev/Targets||[raw-attachment:wiki:UpLoads:ZRsFinancialTargets2023-24.pdf Front loading of Capital Expenditure in the year 2023-24] ||18.04.2023||Financial Targets||
    9  ||23||2023/CE-I/EDCE(G)/Misc||[raw-attachment:wiki:UpLoads:Inst_incorporated_JPO_Cir18042023.pdf Instructions for incorporating the JPO, Circular etc. provision in the Tender Document for all works requiring digging work close to Railway signaling, telecom, electrical etc. cables.]||18.04.2023||Digging Work||
    10  ||22||2023/TeleDev/Unified Communicatiion||[raw-attachment:wiki:UpLoads:ZRsNetworkingFOISDR.pdf Networking arrangement for FOIS DR] ||17.04.2023||FOIS Network||
    11  ||21||2022/Tele/14(1)/2||[raw-attachment:wiki:UpLoads:BSNL_MTNL_Net12042023.pdf Mandatory Utilization of network of BSNL, MTNL & other similarly placed PSU like !RailTel and Powertel.] ||12.04.2023||MTNL, BSNL Network||
    12  ||20||2020/Tele/15(18)/4(3317053)||[raw-attachment:wiki:UpLoads:PMI-MII_PolicyGuidelines05042023.pdf Adherence to PMI-MII Policy Guidelines – Clarification from DoT] ||05.04.2023||DPIIT PMI-MII ||
    13  ||19||2022/GS/IR Cable laying policy||[raw-attachment:wiki:UpLoads:CableDuctPolicy.pdf Guidelines for S&T Cable laying in Ducts] ||29.03.2023||Cable laying||
    14  ||18||2023/Tele/5(1)/1(3322591)||[raw-attachment:wiki:UpLoads:20230328PositionofTelecomAssetsinPCDO.pdf Position of Telecom Assets in PCDO] ||28.03.2023||Telecom Assets in PCDO ||
    15  ||17||2020/Tele/Misc/1/1(3416153)||[raw-attachment:wiki:UpLoads:Tele_Dir_Update_24032023.pdf Updation of Telephone Directory] ||24.03.2023||Telephone Directory ||
    16  ||16||2023/Tele/11(2)/1(3424021)||[raw-attachment:wiki:UpLoads:PEs_Bulk_SMS_TRAI.pdf Sending of Bulk SMS by PEs - Implementation of Directions issued by TRAI under the TCCCPR-2018 reg.] ||16.03.2023||Bulk SMS by PEs ||
    17  ||15||2022/Tele/14(1)/2 (REPC Clearnce)||[raw-attachment:wiki:UpLoads:MoM_REPC_21022023.pdf Minutes of Meeting held with DoT RE, IRCON and Railway Units in relation to REPC through VC on 21.02.2023] ||22.02.2023||MoM REPC||
    18  ||14||2021/TeleDev/Telecom Works||[raw-attachment:wiki:UpLoads:WCR_Telecomworks22-23-2.pdf WCR-Sanctioned Itemized Work Under PH-33] ||17.02.2023||WCR Sanctioned Work PH-33||
    19  ||13||2021/TeleDev/Telecom Works||[raw-attachment:wiki:UpLoads:NWR_teleworks22-23.pdf NWR-Sanctioned Itemized Work Under PH-33] ||17.02.2023||NWR Sanctioned Work PH-33||
    20  ||12||2021/TeleDev/Telecom Works||[raw-attachment:wiki:UpLoads:NR_Telecomwork22-23-1dtd20022023.pdf NR-Sanctioned Itemized Work Under PH-33] ||17.02.2023||NR Sanctioned Work PH-33||
    21  ||11||2021/TeleDev/Telecom Works||[raw-attachment:wiki:UpLoads:NR_Telecomwork22-23dtd20022023.pdf NR-Sanctioned Itemized Work-I Under PH-33] ||17.02.2023||NR Sanctioned Work-I PH-33||
    22  ||10||2021/TeleDev/Telecom Works||[raw-attachment:wiki:UpLoads:ER_Telecomwork22-23.pdf ER-Sanctioned Itemized Work Under PH-33] ||17.02.2023||ER Sanctioned Work PH-33||
    23  ||9||2021/TeleDev/Telecom Works||[raw-attachment:wiki:UpLoads:ECR_Telecomwork22-23.pdf ECR-Sanctioned Itemized Work Under PH-33] ||17.02.2023||ECR Sanctioned Work PH-33||
    24  ||8||2020/TeleDev/Implementation of LTE||[raw-attachment:wiki:UpLoads:RDSO_LTE_Trial500km15022023.pdf Trials of 4G LTE-R systems in 500 RKM in SCR] ||15.02.2023||Implementation of LTE||
    25  ||7||2020/TeleDev/CCTV Project||[raw-attachment:wiki:UpLoads:NITI-Aayog_vss14.02.23.pdf Difficulties in implementation of CCTV Surveillance at Railway Stations.]||14.02.2023||CCTV Project||
    26  ||6||2019/Tele/15(18)4 Pt||[raw-attachment:wiki:UpLoads:PMI-MIIPolicyGuidelines14022023.pdf Adherence to PMI-MII Policy Guidelines]||14.02.2023||Make in India (MII)||
    27  ||5||C-22011/1/2021-Dir-Tele||[raw-attachment:wiki:UpLoads:MoMCCEsMeeting10.01.2023.pdf Minutes of the Meeting (VC) with CCEs All Indian Railways held on 10th Jan. 2023]||09.02.2023||CCEs MoM||
    28  ||4||2022/14(1)2 (REPC Clearance)||[raw-attachment:wiki:UpLoads:MoM_REPC06022023.pdf Minutes of the Meeting (VC) with DoT, CORE & IRCON held on 06 Feb. 2023]||06.02.2023||REPC MoM||
    29  ||3||2020/Tele/15(10)3||[raw-attachment:wiki:UpLoads:2020_Tele_15(10)3(3321440)01022023.pdf Clarification regarding tariff of additional Codec/ Camera installed for VVIP events at same Central/ Remote locations]||01.02.2023||VVIP Events||
     6 ||27||2023/TeleDev/CCTVprojectsPt-1||[raw-attachment:wiki:UpLoads:VSS_addWorks_RCIL26.04.23.pdf Additional Cameras at Stations where VSS work is being executed by RCIL] ||26.04.2023||CCTV Cameras||
     7 ||26||2023/TeleDev/Targets||[raw-attachment:wiki:UpLoads:TargetsTelecomWorks-FY2023-24.pdf Targets for Telecom Work F.Y.2023-24] ||19.04.2023||Telecom Targets||
     8 ||25||2023/TeleDev/Targets||[raw-attachment:wiki:UpLoads:ZRsFinancialTargets2023-24.pdf Front loading of Capital Expenditure in the year 2023-24] ||18.04.2023||Financial Targets||
     9 ||24||2023/CE-I/EDCE(G)/Misc||[raw-attachment:wiki:UpLoads:Inst_incorporated_JPO_Cir18042023.pdf Instructions for incorporating the JPO, Circular etc. provision in the Tender Document for all works requiring digging work close to Railway signaling, telecom, electrical etc. cables.]||18.04.2023||Digging Work||
     10 ||23||2023/TeleDev/Unified Communicatiion||[raw-attachment:wiki:UpLoads:ZRsNetworkingFOISDR.pdf Networking arrangement for FOIS DR] ||17.04.2023||FOIS Network||
     11 ||22||2022/Tele/14(1)/2||[raw-attachment:wiki:UpLoads:BSNL_MTNL_Net12042023.pdf Mandatory Utilization of network of BSNL, MTNL & other similarly placed PSU like !RailTel and Powertel.] ||12.04.2023||MTNL, BSNL Network||
     12 ||21||2020/Tele/15(18)/4(3317053)||[raw-attachment:wiki:UpLoads:PMI-MII_PolicyGuidelines05042023.pdf Adherence to PMI-MII Policy Guidelines – Clarification from DoT] ||05.04.2023||DPIIT PMI-MII ||
     13 ||20||2022/GS/IR Cable laying policy||[raw-attachment:wiki:UpLoads:CableDuctPolicy.pdf Guidelines for S&T Cable laying in Ducts] ||29.03.2023||Cable laying||
     14 ||19||2023/Tele/5(1)/1(3322591)||[raw-attachment:wiki:UpLoads:20230328PositionofTelecomAssetsinPCDO.pdf Position of Telecom Assets in PCDO] ||28.03.2023||Telecom Assets in PCDO ||
     15 ||18||2020/Tele/Misc/1/1(3416153)||[raw-attachment:wiki:UpLoads:Tele_Dir_Update_24032023.pdf Updation of Telephone Directory] ||24.03.2023||Telephone Directory ||
     16 ||17||2023/Tele/11(2)/1(3424021)||[raw-attachment:wiki:UpLoads:PEs_Bulk_SMS_TRAI.pdf Sending of Bulk SMS by PEs - Implementation of Directions issued by TRAI under the TCCCPR-2018 reg.] ||16.03.2023||Bulk SMS by PEs ||
     17 ||16||2022/Tele/14(1)/2 (REPC Clearnce)||[raw-attachment:wiki:UpLoads:MoM_REPC_21022023.pdf Minutes of Meeting held with DoT RE, IRCON and Railway Units in relation to REPC through VC on 21.02.2023] ||22.02.2023||MoM REPC||
     18 ||15||2021/TeleDev/Telecom Works||[raw-attachment:wiki:UpLoads:WCR_Telecomworks22-23-2.pdf WCR-Sanctioned Itemized Work Under PH-33] ||17.02.2023||WCR Sanctioned Work PH-33||
     19 ||14||2021/TeleDev/Telecom Works||[raw-attachment:wiki:UpLoads:NWR_teleworks22-23.pdf NWR-Sanctioned Itemized Work Under PH-33] ||17.02.2023||NWR Sanctioned Work PH-33||
     20 ||13||2021/TeleDev/Telecom Works||[raw-attachment:wiki:UpLoads:NR_Telecomwork22-23-1dtd20022023.pdf NR-Sanctioned Itemized Work Under PH-33] ||17.02.2023||NR Sanctioned Work PH-33||
     21 ||12||2021/TeleDev/Telecom Works||[raw-attachment:wiki:UpLoads:NR_Telecomwork22-23dtd20022023.pdf NR-Sanctioned Itemized Work-I Under PH-33] ||17.02.2023||NR Sanctioned Work-I PH-33||
     22 ||11||2021/TeleDev/Telecom Works||[raw-attachment:wiki:UpLoads:ER_Telecomwork22-23.pdf ER-Sanctioned Itemized Work Under PH-33] ||17.02.2023||ER Sanctioned Work PH-33||
     23 ||10||2021/TeleDev/Telecom Works||[raw-attachment:wiki:UpLoads:ECR_Telecomwork22-23.pdf ECR-Sanctioned Itemized Work Under PH-33] ||17.02.2023||ECR Sanctioned Work PH-33||
     24 ||9||2020/TeleDev/Implementation of LTE||[raw-attachment:wiki:UpLoads:RDSO_LTE_Trial500km15022023.pdf Trials of 4G LTE-R systems in 500 RKM in SCR] ||15.02.2023||Implementation of LTE||
     25 ||8||2020/TeleDev/CCTV Project||[raw-attachment:wiki:UpLoads:NITI-Aayog_vss14.02.23.pdf Difficulties in implementation of CCTV Surveillance at Railway Stations.]||14.02.2023||CCTV Project||
     26 ||7||2019/Tele/15(18)4 Pt||[raw-attachment:wiki:UpLoads:PMI-MIIPolicyGuidelines14022023.pdf Adherence to PMI-MII Policy Guidelines]||14.02.2023||Make in India (MII)||
     27 ||6||C-22011/1/2021-Dir-Tele||[raw-attachment:wiki:UpLoads:MoMCCEsMeeting10.01.2023.pdf Minutes of the Meeting (VC) with CCEs All Indian Railways held on 10th Jan. 2023]||09.02.2023||CCEs MoM||
     28 ||5||2022/14(1)2 (REPC Clearance)||[raw-attachment:wiki:UpLoads:MoM_REPC06022023.pdf Minutes of the Meeting (VC) with DoT, CORE & IRCON held on 06 Feb. 2023]||06.02.2023||REPC MoM||
     29 ||4||2020/Tele/15(10)3||[raw-attachment:wiki:UpLoads:2020_Tele_15(10)3(3321440)01022023.pdf Clarification regarding tariff of additional Codec/ Camera installed for VVIP events at same Central/ Remote locations]||01.02.2023||VVIP Events||
     30 ||3||2023/Tele/8(4)/1 (3419483)||[raw-attachment:wiki:UpLoads:VoiceRecordingGateCommunication27012023.pdf Provision of "Gate Telephone with Voice Recording Facility" on non-interlocked manned LC Gate.]||27.01.2022||Gate Telephone||
    3031 ||2||2020/Tele/15(3)2||[raw-attachment:wiki:UpLoads:Yardsticks-16012023.pdf Revision of Yardsticks of Telecom Department.] PCSTE Committee [raw-attachment:wiki:UpLoads:PCSTE_Committee_Report.pdf Report]||16.01.2023||Telecom Yardsticks||
    3132 ||1||2023/Tele/15(13)2||[raw-attachment:wiki:UpLoads:Law_Enforcement_Agencies-04012023.pdf Incident of Malicious Communication reported by Law Enforcement Agencies (LEAs).]||04.01.2023||Malicious Communication||
     
    8687 ||14||2020/TeleDev/LTE Implementation||[raw-attachment:wiki:UpLoads:RCIL_VC_28.04.22.pdf MoM held on 28.04.2022 with RCIL]||02.05.2022||RCIL MoM||
    8788 ||13||C-22011/1/2021-DIR-TELE||[raw-attachment:wiki:UpLoads:CCE_VC_11.04.22.pdf MoM with CCE all Zonal Railways held on 11.04.2022]||28.04.2022||CCE MoM||
    88  ||-||MoU||[raw-attachment:wiki:UpLoads:MoU_CDoT_27042022.pdf Memorandum of Understating between Indian Railway & CDoT]||27.04.2022||MoU||
    89  ||12||2021/!TeleDev/ !ReviewofTelecomWorks||[raw-attachment:wiki:UpLoads:Targets_2022-23_26042022.pdf Targets for Telecom Works FY 2022-23]||26.04.2022||Telecom Targets||
    90  ||11||2010/Tele/11(3)/1||[raw-attachment:wiki:UpLoads:20220408_Letter_Availability_VHFsets_Crews_Train-Running-Operations.pdf Availability of VHF sets with Crews to Train Running/Operations]||07.04.2022||Availability of VHF sets with Crews||
    91  ||10||2010/Tele/3(5)1pt||[raw-attachment:wiki:UpLoads:20220406_Guidelines_Maintenance_Schedule-IPIS.pdf Review & Standardization of Maintenance Schedules and AMC/ARC contracts for Telecom equipment system being used on Indian Railways - IPIS] Maintenance Schedule Committee Report click [raw-attachment:wiki:UpLoads:20220325_Committe_Report_Ver_2.0_Signed.pdf here] ||06.04.2022||Maintenance Schedule-IPIS||
    92  ||9||2021/Tele/11(7)/2||[raw-attachment:wiki:UpLoads:ipv6-trial_04042022.pdf Study for migration of Railnet from IPv4 to IPv6.]|| 04.04.2022||IPv6||
    93  ||8||2020/TeleDev/CCTV Project||[raw-attachment:wiki:UpLoads:CCTV_Security_issues-04042022.pdf Regarding Security concern with respect to CCTV surveillance.]|| 04.04.2022||CCTV Surveillance||
    94  ||7||2011/Tele/11(2)/1||[raw-attachment:wiki:UpLoads:MX-M452N_20220425_155309.pdf Extension of existing contract of CUG Mobile Scheme for IR]||31.03.2022||CUG Scheme||
    95  ||6||2020/TeleDev/e-office implementation||[raw-attachment:wiki:UpLoads:Implementation_eOffice210322.pdf Implementation of eOffice application in all RCTs]||21.03.2022||eOffice||
    96  ||5||2022/Tele/MoM||[raw-attachment:wiki:UpLoads:CCE_VC_24.02.22.pdf MoM with CCE all Zonal Railways held on 24.02.2022]||14.03.2022||CCE MoM||
    97  ||4||2020/Tele/9(1)/1||[raw-attachment:wiki:UpLoads:deregulation_decontrol_telecom_items-21032022.pdf Deregulation & Decontrol of select Telecom Items]||21.02.2022||Telecom Items||
    98  ||3||2023/Tele/8(4)/1 (3419483)||[raw-attachment:wiki:UpLoads:VoiceRecordingGateCommunication27012023.pdf Provision of "Gate Telephone with Voice Recording Facility" on non-interlocked manned LC Gate.]||27.01.2022||Gate Telephone||
     89 ||12||MoU||[raw-attachment:wiki:UpLoads:MoU_CDoT_27042022.pdf Memorandum of Understating between Indian Railway & CDoT]||27.04.2022||MoU||
     90 ||11||2021/!TeleDev/ !ReviewofTelecomWorks||[raw-attachment:wiki:UpLoads:Targets_2022-23_26042022.pdf Targets for Telecom Works FY 2022-23]||26.04.2022||Telecom Targets||
     91 ||10||2010/Tele/11(3)/1||[raw-attachment:wiki:UpLoads:20220408_Letter_Availability_VHFsets_Crews_Train-Running-Operations.pdf Availability of VHF sets with Crews to Train Running/Operations]||07.04.2022||Availability of VHF sets with Crews||
     92 ||9||2010/Tele/3(5)1pt||[raw-attachment:wiki:UpLoads:20220406_Guidelines_Maintenance_Schedule-IPIS.pdf Review & Standardization of Maintenance Schedules and AMC/ARC contracts for Telecom equipment system being used on Indian Railways - IPIS] Maintenance Schedule Committee Report click [raw-attachment:wiki:UpLoads:20220325_Committe_Report_Ver_2.0_Signed.pdf here] ||06.04.2022||Maintenance Schedule-IPIS||
     93 ||8||2021/Tele/11(7)/2||[raw-attachment:wiki:UpLoads:ipv6-trial_04042022.pdf Study for migration of Railnet from IPv4 to IPv6.]|| 04.04.2022||IPv6||
     94 ||7||2020/TeleDev/CCTV Project||[raw-attachment:wiki:UpLoads:CCTV_Security_issues-04042022.pdf Regarding Security concern with respect to CCTV surveillance.]|| 04.04.2022||CCTV Surveillance||
     95 ||6||2011/Tele/11(2)/1||[raw-attachment:wiki:UpLoads:MX-M452N_20220425_155309.pdf Extension of existing contract of CUG Mobile Scheme for IR]||31.03.2022||CUG Scheme||
     96 ||5||2020/TeleDev/e-office implementation||[raw-attachment:wiki:UpLoads:Implementation_eOffice210322.pdf Implementation of eOffice application in all RCTs]||21.03.2022||eOffice||
     97 ||4||2022/Tele/MoM||[raw-attachment:wiki:UpLoads:CCE_VC_24.02.22.pdf MoM with CCE all Zonal Railways held on 24.02.2022]||14.03.2022||CCE MoM||
     98 ||3||2020/Tele/9(1)/1||[raw-attachment:wiki:UpLoads:deregulation_decontrol_telecom_items-21032022.pdf Deregulation & Decontrol of select Telecom Items]||21.02.2022||Telecom Items||
    9999 ||2||2020/Tele/Board/MoM||[raw-attachment:wiki:UpLoads:CCE_VC_03.01.22.pdf MoM with CCE all Zonal Railways held on 03.01.2022]||24.01.2022||CCE MoM||
    100100 ||1||2003/Tele/RCIL/1 Pt.IX||[raw-attachment:wiki:UpLoads:Undertakin_digging_work-140122.pdf Procedure for undertaking digging work in the vicinity of Signaling, Electrical and Telecommunication Cable]|| 14.01.2022||Digging Work||