Changes between Version 506 and Version 507 of tele-i


Ignore:
Timestamp:
05/19/23 17:49:32 (14 months ago)
Author:
vpsingh
Comment:

--

Legend:

Unmodified
Added
Removed
Modified
  • tele-i

    v506 v507  
    44
    55 ||'''SN'''||'''File No.'''||'''Subject'''||'''Date'''||'''Salient Features'''||
    6  ||31||2021/Tele Dev/ Review telecom works||[raw-attachment:wiki:UpLoads:Clarification_TC_04-2022-150523.pdf Clarification regarding applicability of TC 04/2022 for VoIP based TCCS.]  Telecom Circular [raw-attachment:wiki:UpLoads:Tele_Cir_4-2022.pdf 04/2022]||15.05.2023||Clarification||
    7  ||30||2021/Tele/11(2)/1||[raw-attachment:wiki:UpLoads:CUG_Revised_Rate11052023.pdf Revised rates for CUG mobile scheme for Indian Railways issued vide Telecom Circular 02/2022 dated 01.05.22..] ||11.05.2023||Revised Rates CUG||
    8  ||29||2020/Tele/TCM/1||[raw-attachment:wiki:UpLoads:2020TeleTCM1-11052023.pdf Credential for checking the correctness of coach composition cum orientation data entered at stations by Zonal Railways.] ||11.05.2023||NTES IPIS||
    9  ||28||2020/Tele/TCM/1||[raw-attachment:wiki:UpLoads:MoM03052023.pdf Minutes of Meeting held with CRIS, RDSO regarding, "Migration of Outdated Serial port based NTES-IPIS integration to modern REST API based NTES-IPIS Integration] for API based NTES-IPIS Integration click [raw-attachment:wiki:UpLoads:API_based_NTES-IPIS_Integration.pdf here]||09.05.2023||NTES IPIS||
    10  ||27||2023/TeleDev/CCTVprojectsPt-1||[raw-attachment:wiki:UpLoads:VSS_addWorks_RCIL26.04.23.pdf Additional Cameras at Stations where VSS work is being executed by RCIL] ||26.04.2023||CCTV Cameras||
    11  ||26||2023/TeleDev/Targets||[raw-attachment:wiki:UpLoads:TargetsTelecomWorks-FY2023-24.pdf Targets for Telecom Work F.Y.2023-24] ||19.04.2023||Telecom Targets||
    12  ||25||2023/TeleDev/Targets||[raw-attachment:wiki:UpLoads:ZRsFinancialTargets2023-24.pdf Front loading of Capital Expenditure in the year 2023-24] ||18.04.2023||Financial Targets||
    13  ||24||2023/CE-I/EDCE(G)/Misc||[raw-attachment:wiki:UpLoads:Inst_incorporated_JPO_Cir18042023.pdf Instructions for incorporating the JPO, Circular etc. provision in the Tender Document for all works requiring digging work close to Railway signaling, telecom, electrical etc. cables.]||18.04.2023||Digging Work||
    14  ||23||2023/TeleDev/Unified Communicatiion||[raw-attachment:wiki:UpLoads:ZRsNetworkingFOISDR.pdf Networking arrangement for FOIS DR] ||17.04.2023||FOIS Network||
    15  ||22||2022/Tele/14(1)/2||[raw-attachment:wiki:UpLoads:BSNL_MTNL_Net12042023.pdf Mandatory Utilization of network of BSNL, MTNL & other similarly placed PSU like !RailTel and Powertel.] ||12.04.2023||MTNL, BSNL Network||
     6 ||32||2021/Tele Dev/ Review telecom works||[raw-attachment:wiki:UpLoads:Clarification_TC_04-2022-150523.pdf Clarification regarding applicability of TC 04/2022 for VoIP based TCCS.]  Telecom Circular [raw-attachment:wiki:UpLoads:Tele_Cir_4-2022.pdf 04/2022]||15.05.2023||Clarification||
     7 ||31||2021/Tele/11(2)/1||[raw-attachment:wiki:UpLoads:CUG_Revised_Rate11052023.pdf Revised rates for CUG mobile scheme for Indian Railways issued vide Telecom Circular 02/2022 dated 01.05.22..] ||11.05.2023||Revised Rates CUG||
     8 ||30||2020/Tele/TCM/1||[raw-attachment:wiki:UpLoads:2020TeleTCM1-11052023.pdf Credential for checking the correctness of coach composition cum orientation data entered at stations by Zonal Railways.] ||11.05.2023||NTES IPIS||
     9 ||29||2020/Tele/TCM/1||[raw-attachment:wiki:UpLoads:MoM03052023.pdf Minutes of Meeting held with CRIS, RDSO regarding, "Migration of Outdated Serial port based NTES-IPIS integration to modern REST API based NTES-IPIS Integration] for API based NTES-IPIS Integration click [raw-attachment:wiki:UpLoads:API_based_NTES-IPIS_Integration.pdf here]||09.05.2023||NTES IPIS||
     10 ||28||2023/TeleDev/CCTVprojectsPt-1||[raw-attachment:wiki:UpLoads:VSS_addWorks_RCIL26.04.23.pdf Additional Cameras at Stations where VSS work is being executed by RCIL] ||26.04.2023||CCTV Cameras||
     11 ||27||2023/TeleDev/Targets||[raw-attachment:wiki:UpLoads:TargetsTelecomWorks-FY2023-24.pdf Targets for Telecom Work F.Y.2023-24] ||19.04.2023||Telecom Targets||
     12 ||26||2023/TeleDev/Targets||[raw-attachment:wiki:UpLoads:ZRsFinancialTargets2023-24.pdf Front loading of Capital Expenditure in the year 2023-24] ||18.04.2023||Financial Targets||
     13 ||25||2023/CE-I/EDCE(G)/Misc||[raw-attachment:wiki:UpLoads:Inst_incorporated_JPO_Cir18042023.pdf Instructions for incorporating the JPO, Circular etc. provision in the Tender Document for all works requiring digging work close to Railway signaling, telecom, electrical etc. cables.]||18.04.2023||Digging Work||
     14 ||24||2023/TeleDev/Unified Communicatiion||[raw-attachment:wiki:UpLoads:ZRsNetworkingFOISDR.pdf Networking arrangement for FOIS DR] ||17.04.2023||FOIS Network||
     15 ||23||2022/Tele/14(1)/2||[raw-attachment:wiki:UpLoads:BSNL_MTNL_Net12042023.pdf Mandatory Utilization of network of BSNL, MTNL & other similarly placed PSU like !RailTel and Powertel.] ||12.04.2023||MTNL, BSNL Network||
     16 ||22||2021/Tele/11(2)/1(3346054)||[raw-attachment:wiki:UpLoads:SIMs_HHT_TicketCheckingStaff05042023.pdf Provision of SIMs for Hand Held Terminals being used Ticket Checking Staff.] ||05.04.2023||SIMs for HHT||
    1617 ||21||2020/Tele/15(18)/4(3317053)||[raw-attachment:wiki:UpLoads:PMI-MII_PolicyGuidelines05042023.pdf Adherence to PMI-MII Policy Guidelines – Clarification from DoT] ||05.04.2023||DPIIT PMI-MII ||
    1718 ||20||2022/GS/IR Cable laying policy||[raw-attachment:wiki:UpLoads:CableDuctPolicy.pdf Guidelines for S&T Cable laying in Ducts] ||29.03.2023||Cable laying||