Changes between Version 82 and Version 83 of tele-i
- Timestamp:
- 08/06/12 12:11:54 (11 years ago)
Legend:
- Unmodified
- Added
- Removed
- Modified
-
tele-i
v82 v83 7 7 1. [raw-attachment:wiki:UpLoads:2006_Tele_TP_1-dt.3.5.12.pdf Laying OFC & QC 2012] - Maintenance of OFC system for automatic signalling. Lt.No.2006/Tele/TP/1 Dtd. 03.05.2012 8 8 1. [raw-attachment:wiki:UpLoads:SCNP-F.631-12-dtd.27042012.pdf SCNP 2012] - Allocation of 9 MHz Ku-band capacity in Transponder No. 6 on INSAT-4CR to Indian Railways. Lt.No.SCNP/F.631/12 Dtd. 27.04.2012 9 1. [raw-attachment:wiki:UpLoads:Inspection_of_ISS_equipment_dtd.26.04.12.pdf ISS 2012] - Inspection of ISS equipment. Lt.No.2010/Tele/9(1)/1 Dtd. 26.04.2012 9 10 1. [raw-attachment:wiki:UpLoads:2010_Tele_3-5_1-Dt.26.03.12.pdf OFC Maintenance 2012] - Maintenance of OFC system for automatic signalling. Lt.No.2010/Tele/3(5)/1 Dtd. 26.03.2012 10 11 1. [raw-attachment:wiki:UpLoads:WPC-Lt.No.P-11014-34-2009-PP(1)dt.22032012.pdf WPC 2012] - Royalty charges for Assignments of Frequencies to 'Captive Users' (users being charged on farmula basis) including all Government Users, involving Single Channel Operation for fixed/land/land Mobile Stations/terrestrial Broadcasting. Lt.No.P-11014/34/2009-PP(1)Dtd. 22.03.2012